Sign up to receive a text message or email when new bids are added!
Bid Number: 30295.00
Bid Title: Spring-Fishburne US 17 Drainage Improvements Phase 5 Pump Station Building and Mechanical Systems
Category: Stormwater
Status: Closed

Description:

CITY OF CHARLESTON DEPARTMENT OF STORMWATER MANAGEMENT (Owner) is requesting Contractor Statement of Qualifications for the City’s consideration in prequalifying Contractors as qualified to submit a Bid for the construction of the following Project:

 

SPRING/FISHBURNE US 17 DRAINAGE IMPROVEMENTS PHASE 5 PUMP STATION BUILDING AND MECHANCIAL SYSTEMS

Project No. 30295.00


Project Overview

Phase 5 of the Spring/Fishburne US 17 Drainage Improvements Project, the fifth and final phase of the Project, is currently in final design and is expected to start construction in the first (1st) quarter of 2023. The Work to be completed will be located at the Lockwood Drive Pump Station site (135 Lockwood Drive, Charleston, SC 29403) and will generally include site and vertical work supporting the construction of a pump station building atop the existing pump station wet well completed as a part of a previous phase of the Project. Work will also include the installation of mechanical and building systems to include electrical, instrumentation, and ventilation systems supporting the operation of the pump station, and the installation of three (3) large (66-inch) axial flow stormwater pumps, right-angle gears, and diesel engine driven power modules. An overview of the City of Charleston’s Spring/Fishburne US 17 Drainage Improvements Project can be viewed at the following web address: http://www.springfishburnedrainage.com/.

 

Phase 5 includes the following Work / Requirements:

  • Site work
    1. Domestic water piping installation
    2. Storm drain piping and structure installation
    3. Grading
    4. Paving
    5. Landscaping
      1. Sanitary Sewer infrastructure to include gravity piping, site grinder pump station, and associated force main.
      2. Architectural elements
        • Brick masonry
          • Cast stone detailing
            • Architectural Metal Panels
            • Wrought iron work
            • SBS modified roofing
            • Equipment Screening
            • Roll-up doors
            • Personnel doors
              • Windows
            • Ventilation Fans
            • Louvers
            • Low voltage wiring
            • Lighting
            • Conduit routing and installation
            • Work within classified areas
          • Domestic water fixture piping
          • Sanitary sewer service
            • Roof drains and internal piping
          • Fire Alarm
          • Sprinkler System
          • Framing
            • Bridge crane
            • Tilt-up concrete wall panels (pre-cast option)
          • Precision leveling of pump support plates
          • Grouting of pump support plates
          • Setting of large (66-inch) axial flow stormwater pumps
          • Precision alignment of shafts (Pump to right-angle gear, and right-angle gear to HPTO clutch)
            • Startup and Commissioning
            • Precision leveling of power module skid
            • Grouting of power module skid
            • Setting and installation of supporting components (e.g., radiator, HPTO clutch, pre-lubrication system, block heater, oil heater, etc.)
            • Precision alignment of shafts (HPTO clutch output shaft to right-angle gear input shaft)
              • Fuel supply system
              • Exhaust system
              • Supporting component installation
              • Startup and commissioning
        • Installation of various instruments to support system operation

 

Obtaining the Request for Qualification (RFQ) Documents

The RFQ Documents for the Project can be found at and downloaded from a designated website. Access rights to the designated website may be obtained by emailing . The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting an RFQ for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website identified below:

https://davisfloyd.filegenius.com

 

Instructions to Contractors

For all further requirements regarding qualifications, procedures, and notice of prequalification determination, refer to the Request for Qualifications (RFQ) Documents.

 

This Advertisement is issued by:

Owner: City of Charleston Department of Stormwater Management 

By:     Steven A. Kirk, PE

Title:  Senior Engineering Project Manager 

Date:  August 26 2022

Publication Date/Time:
8/26/2022 2:45 PM
Closing Date/Time:
10/4/2022 2:00 PM
Pre-bid Meeting:
N/A
Contact Person:
Steve A Kirk, PE
843-579-7682
kirks@charleston-sc.gov
Fee:
N/A
Business Hours:
8:30am-5:00pm
Plan Holders List:
N/A
Related Documents:

Return To Main Bid Postings Page